SARASOTACONCRETEGet an estimate
Coastal

Storm Season Hardscape Playbook: before June 1, during a watch, and the first 72 hours after

A checklist written after the 2024 season, for pavers and concrete on the Sarasota coast.

Season
June 1 to November 30
Worst weeks locally
Mid-August to mid-October
Recent events
Ian 2022; Helene and Milton 2024
First rule
Photograph everything in May

What should hardscape owners do before June 1 on the Sarasota coast?

Photograph every surface with a date stamp, including the edges and the pool coping; top up joint sand and reseal if due; check that edge restraint is concrete on any edge a surge can reach; make sure deck and yard drains run; and note where the survey pins are so a shifted field can be re-laid to the lot line. During a watch, move furniture and planters off pavers. After, follow the post-storm sequence before anyone touches the surface.

The 2024 season is the reference: Helene's 6.68-foot surge on Longboat Key on September 26 and Milton's landfall near Siesta Key on October 9 put most island hardscape under salt water twice in two weeks.

Before the season (April and May)

  1. Photograph every hardscape surface, close and wide, with the date; save to the cloud.
  2. Inspect edge restraint; replace spiked plastic with a concrete curb on seawall, street and Gulf-side edges.
  3. Re-sand joints to full depth; reseal with a penetrating product if due (18 to 24 months coastal).
  4. Clear deck drains, yard drains and swales; run a hose test.
  5. Sound the pool deck for hollows; a void now is a collapse in a surge.
  6. Locate the survey pins and photograph them.
  7. Keep the paver spares dry and stacked where they won't float.

During a watch (72 to 24 hours out)

  1. Move furniture, planters, grills and loose pavers off the surface and indoors or strapped.
  2. Don't schedule a pour, a sealing or a polymeric sand install inside the window.
  3. Photograph again if the previous set is older than a month.
  4. Turn off irrigation so the base isn't saturated before the surge.

After (first 72 hours)

  1. Photograph everything before moving anything; the insurer needs the untouched state.
  2. Don't pressure-wash; don't reset pavers; don't resurface. Let the base drain.
  3. Note the waterline height on walls and the direction the pavers moved.
  4. Rinse salt from concrete and stone surfaces with fresh water once the yard drains.
  5. File the claim with the photos and the pre-season set.

Then the restoration sequence and the documentation guide.

Questions we get about this

Should I seal pavers before hurricane season?

If they're due, yes, and finish by late May so the sealer cures before the rain pattern sets in. A fresh penetrating sealer keeps salt and silt out of the paver body; it doesn't hold the field down. What holds the field down is edge restraint and a full joint.

Can you pour concrete during hurricane season?

Yes; June through November is half the year and most pours happen then. Pours are scheduled around the afternoon rain and, on the islands, not inside a named-storm watch window. A slab poured 48 hours before a surge is a slab poured for nothing.

Before June 1

  1. Check the joint sand. Joints that have dropped more than a quarter inch let water into the base. Top them up with polymeric sand and let them cure dry before the season starts.
  2. Check the edge restraint. Walk the perimeter and push. Anything that moves is the line a surge will open first. Spiked restraint at a seawall or a street edge should be replaced with a poured curb.
  3. Clear the drainage. Deck drains, yard drains and the roadside swale all have to be flowing before the first storm, not after it.
  4. Photograph everything. Dated wide shots and close-ups of every hardscape surface, stored off the property. This is the single highest-value hour of preparation, because it is the before picture an adjuster will ask for.
  5. Seal if it is due. A sealed surface sheds silt and salt more easily. If the cycle is due in the summer, do it in May rather than September.
  6. Move loose items. Furniture, planters and grills become projectiles and gouge a deck on the way past.

The first week after a surge, in order

Post-surge sequence
DayActionWhy the order matters
0 to 1Photograph before touching anything; note water lines on walls and fencesThe adjuster's file is built from this; cleaning first destroys the evidence
1 to 3Clear debris by hand, not by pressure washerHigh pressure drives salt and silt into the joints and strips the remaining sand
3 to 7Let the base drain; walk it and mark low or hollow areas with chalkA saturated base cannot be assessed or compacted
7 to 21Sound the surface and survey for voids; get the restoration scope writtenVoids are invisible from above and decide repair against rebuild
After dryingLift, flush the base with fresh water, rebuild in lifts, reset units, new polymeric sand on a dry dayResetting on wet salty base means doing it twice
+30 daysClean and sealSealing traps salt and moisture if it is done early

What is a repair and what is a rebuild

The test is the base, not the surface. A paver field where the units shifted but the base sounds solid is a lift-and-reset, typically $8 to $15 per square foot of the affected area. A field over voids, or a slab that was undermined, is a rebuild regardless of how the surface looks.

Concrete behaves worse than pavers here for a structural reason: a slab spans its voids until it cracks, so the damage is hidden until it fails, and the remedy is demolition. A paver field telegraphs the void as a dip you can see and fix in sections with the original units. That asymmetry is the strongest argument for pavers on a barrier island or a canal lot, and it is worth more than any appearance argument.

The documentation side is on the insurance documentation guide; the mechanics are on paver repair and storm restoration.

Last reviewed September 10, 2026 by the Sarasota Concrete editorial team (author name pending owner input). Written after the 2024 season; updated after each season.