SARASOTACONCRETEGet an estimate
Compare

Comparisons written for Sarasota's ground, salt and heat

Nine decisions, each with what's documented, what's inferred and what will be measured.

Nine side-by-side decisions, each written for Sarasota's ground, salt and heat rather than for a generic climate. Every comparison states what is documented, what is inference, and what this site will measure itself.

Nine decisions, and the order to make them in

Material comparisons are usually written to sell a material. These are written to be used in sequence, because the answers constrain each other: the flood zone limits what makes sense to build, the pool chemistry limits the stone, and the heat question only matters once the first two are settled.

  1. Repair or replace. Six tests on the existing slab decide whether anything else on this list is relevant.
  2. Concrete or pavers. Twenty-year cost, flood behaviour and repairability, not appearance.
  3. Overlay or rebuild on a deck. Cool deck against pavers on lifespan and carrying cost.
  4. Which stone, if stone. Travertine, shellstone and porcelain on heat, slip and salt.
  5. Stone or concrete pavers. Where the premium pays and where it does not.
  6. Heat. What colour, mass and texture actually do at two in the afternoon.
  7. Thickness. Four inches or six, by load rather than by budget.
  8. Reinforcement. Rebar, mesh or fiber on this soil.
  9. Sealer. Penetrating or film, decided by distance from the water.

Running them out of order is how people end up with a beautiful travertine deck on a base that a surge will empty, or a porcelain lanai on a bedding layer that lets the tiles rock.

What every comparison on this site refuses to do

  • Quote a temperature we did not measure. The figures circulating in Florida paver marketing, that travertine runs twenty to thirty degrees cooler than concrete, come from vendor pages with no method and no instrument. They may well be directionally right. They are not a measurement, so they are attributed rather than repeated as fact.
  • Declare a winner without a scenario. Every comparison ends in a table of situations, because a driveway east of I-75 and a pool deck on Casey Key have different right answers.
  • Hide the maintenance. A material's carrying cost over twenty years is part of its price, and on this coast the sealing interval is set by distance from open water.

The numbers behind all nine comparisons

Each comparison page argues from the same underlying figures. Collecting them here means the arguments can be checked against one table rather than nine.

Reference figures used across the comparison pages
QuantityFigureWhere it comes from
Minimum residential slab thickness4 inchesFlorida Building Code, Residential, Chapter 19 referencing ACI 332
Thickness for RV, boat-trailer and dumpster pads5 to 6 inchesLoad-based specification used on this site
Working mix4,000 PSI, water-cement ratio at or below 0.45Site specification for coastal chloride exposure
Code-minimum mix3,000 PSIFlorida Building Code, Residential
Control joint spacing, 4-inch slab8 to 10 feet, cut to one quarter of slab depth, same dayACI 332 practice
Minimum drainage slope1/8 inch per foot away from the structureSite specification
Paver base, patios and pool decks4 inches compacted in 3-inch liftsICPI and CMHA practice
Paver base, driveways6 inches, 8 inches on wet lotsSame
Bedding sandExactly 1 inch, screeded, not compacted before layingSame
Time before driving on new concrete7 days for cars, 28 days for heavy vehiclesRoughly 70 percent of design strength at 7 days
Wait before sealing new pavers30 daysAllows efflorescence to work out
Paver sealer life, within a mile of open water18 to 24 monthsFlorida sealing-contractor guidance
Paver sealer life, inland2 to 3 yearsSame
Wet slip targetDynamic coefficient of friction 0.42 or higherANSI A326.3
Impervious coverage cap, RSF lot50 percent, counting pool decks, concrete and paversSarasota County Zoning Appendix A § 6.5
Concrete paver installed cost$13 to $16 per square footPublished Sarasota-area pricing, September 10, 2026
Travertine installed cost$20 to $26 per square footSame
Decorative overlay installed cost$10 to $15 per square footSame
Cool deck service life5 to 8 years before resurfacingVendor and contractor guidance, attributed
Concrete paver service life25 to 30 yearsSame

Two entries in that table are attributed rather than measured, and they are marked as such: cool deck service life and paver service life come from vendor and contractor guidance. Everything else is either a code citation, a published price read on a stated date, or a specification this site applies.

Last reviewed September 10, 2026 by the Sarasota Concrete editorial team (author name pending owner input).