SARASOTACONCRETEGet an estimate
FAQ

Permit, HOA and flood FAQ: the questions between the office pages

Eight answers here, fourteen pointers to the office and rule pages.

Permit, HOA and flood questions answered here

Is there a fee to look up permits on my property?

No. Sarasota County's permit search, the City of Sarasota's FTG portal, Venice's eTRAKiT and North Port's Click2Gov are public; Charlotte County's records are online too.

Can a contractor start before the permit is issued?

Demolition and layout sometimes, the regulated work never. In Charlotte County the Notice of Commencement has to be recorded before the first inspection.

What if my HOA approves something the county won't permit?

The permit wins; you'll need to change the design and go back to the committee. Submitting both at once catches that early.

Do I need a survey?

For anything at a lot line, in a setback, or in an ARC packet, yes; the survey from your closing usually works. For a like-for-like pool deck inside a cage, a site sketch is often enough.

Does the county inspect a driveway?

Right-of-way work is inspected by the county or city (line and grade, culvert, swale). Private flatwork inspections depend on the permit type; Charlotte County lists them on the job card.

What is a coastal setback variance and how long does it take?

County Commission approval to build seaward of the Gulf Beach Setback Line, after staff review and a public hearing. Months, not weeks, and not guaranteed.

Is elevation certificate needed for a pool deck?

Not for site work by itself; it's needed when the building's flood compliance is in play, and Longboat Key may ask for it in a substantial-improvement file.

Can I get the permit history of a house before I buy?

Yes, from the portals above by address. Unpermitted pool decks and driveways show up as gaps.

Canonical answers on other pages

Every rule referenced on this page, with its citation

Citations behind the permit, HOA and flood answers
RuleCitation
Work in county right-of-way requires a permit from the County EngineerSarasota County Code Ch. 74; fees Ch. 98 § 98-3
Driveway culvert permit, including county survey for line and gradeSarasota County Code § 98-3(b)(1)
County Operating Certificate plus Certificate of Competency for regulated tradesSarasota County Code Ch. 22 Art. V § 22-122
Owner-contractor exemption, in-person signature, direct supervisionSarasota County Code § 22-122(3), (6)
Impervious coverage capped at 50 percent of an RSF lotSarasota County Zoning App. A § 6.5
Construction prohibited seaward of the Gulf Beach Setback Line without a varianceSarasota County Code Ch. 54 Art. XXII § 54-723
Marine turtle lighting, May 1 to October 31Sarasota County Code Ch. 54 Art. XXIII; Venice beach area Art. XXV
Turtle-friendly bulbs at 560 nm, fully shielded full cut-off fixturesTown of Longboat Key Ch. 100, Ordinance 2021-01, adopted July 2, 2021
State model lighting ordinanceFDEP Rule 62B-55.004, effective December 17, 2020
Substantial damage at 50 percent of pre-damage market valueTown of Longboat Key Code Ch. 154
Site improvements excluded from the substantial-improvement calculationFEMA P-758 guidance; Sarasota County Property Appraiser
All flatwork including pavers requires a permitCharlotte County residential slab and driveway requirements
Notice of Commencement above $5,000Charlotte County; Florida Statute Ch. 713
Licence number required in advertising where one is heldFlorida Statute 489.119(5)(b)
Deposit rules on residential contractsFlorida Statute 489.126
Condominium reserves for items over $10,000Florida Statute 718.112(2)(f)
Pavers and driveways do not require a state construction licenceFlorida DBPR guidance on work not requiring a licence
All read on September 10, 2026. Fees change by resolution and codes are amended; each permit page names the office to confirm with.

Last reviewed September 10, 2026 by the Sarasota Concrete editorial team (author name pending owner input).