A twelve-month pool deck calendar for condo boards

Reserve study in August, bids in the fall, vote in winter, phased build in summer, reopen before the owners are back.

Statute
F.S. 718.112(2)(f) reserves
Bid season
Fall
Vote
Winter, owners present
Build
May to September, phased

What does a twelve-month pool deck calendar look like for a condo board?

Reserve study reviewed in August and the deck component updated; scope written in September so every bidder prices the same base, drains, coping, edge and lighting; bids in October and November; board vote in January or February when owners are present; permit and, where relevant, setback and lighting checks in March; phase one in May, phase two in July, reopening in August, warranty and photos filed in September. Florida Statute 718.112(2)(f) makes pavement resurfacing a reserve item.

The board's job is the scope and the calendar; the contractor's is the base and the phasing. A scope that doesn't specify base depth, drains and edge restraint produces bids that can't be compared and a deck that can't be warranted.

Twelve months

Condo pool deck calendar
MonthBoardContractor
AugustReview reserve study; confirm deck year and funding
SeptemberWrite the scope with a consultant or the leading bidderSite survey, sounding, drain check
October to NovemberSolicit comparable bidsBid with phasing plan and dates
DecemberCompare bids line by line
January to FebruaryVote; contract; depositOrder materials
MarchPermit; ARC or setback and lighting checks; owner noticePermit application; NOC
AprilPhase plan communicated; furniture planMobilization
May to JunePhase one; half the deck openDemolition, base, drains, coping, field
July to AugustPhase twoSame; sand; reopen
SeptemberWarranty, photos, sealing date filedSealing at 30 days

The comparable-bid scope

  • Square footage, coping linear feet, cage anchors.
  • Base depth and material, geotextile, drains and their outlet.
  • Material, manufacturer, color, pattern; coping profile.
  • Edge restraint type at each edge.
  • Phasing plan with dates and temporary edge details.
  • ADA access, slip rating (wet DCOF 0.42), lighting compliance on beach-visible decks.
  • Warranty terms, insurance, permit responsibility, legal name.

Questions we get about this

How does a condo board phase a pool deck project with a reserve study?

The reserve study's remaining-life estimate sets the year; the board budgets from reserves (pavement resurfacing and any item over $10,000 are statutory reserve components under Florida Statute 718.112), takes comparable bids on a written scope in the fall, votes in winter when owners are present, and builds in phases from May to September so half the deck stays open.

What if reserves are short?

A special assessment, voted under the association's documents; the shortfall usually traces to a component list that never added the last resurfacing. Update the study before bidding.

How long does a phased deck take?

Two to four weeks per phase for a typical 2,000 to 4,000 square foot common deck, with a week between phases to swap the temporary edge and reopen.